
Melbourne data centre mechanical contractor
Precision cooling for white space and CBD conversions.
Design and construct specialists
Builder-side mechanical for data centre fit-outs and CBD office conversions. More than 50 server rooms behind us, and a clear view of what downtime costs.
Priced from your scope, delivered to your program, commissioning records complete at handover.
- More than 50 server rooms
- Mechanical packages $50,000 to $1 million
- Ten year workmanship warranty on systems we install and maintain
- Builder-side, working to your program
Honest experience
What we've done, and what we haven't.
More than 50 server rooms
Delivered across our commercial and architectural work. Precision cooling, CRAC and CRAH, designed in-house and commissioned with the records to prove it.
Cooling-critical builds
High-density heat loads. The builds closest in character to data centre white space on our books.
Mechanical HVAC since 2014
Documented commissioning discipline that carries straight into critical-environment work.
No hyperscale claims. We haven't delivered a hyperscale data centre and won't pretend otherwise. The case for us is the work above, and a team sized for the single-hall work the tier ones won't quote. We would rather earn the work on the honest version than win it on a stretched one.
Where DC projects fail
Projects fail at the interfaces.
Rarely the technology. The same three failure patterns run through mechanical fit-outs, and we plan against each one.
Late commissioning
Testing each system in isolation in the final three weeks is how data halls fail quietly. We commission progressively: mechanical proven with electrical and controls, witnessed with the other trades, under load.
Scope gaps between civil and M&E
When civil and M&E are procured separately, cable routes clash with structure and void depths don't match airflow design. We coordinate against structure and services from the first shop drawing. Scope boundaries are our problem to manage, not the builder's.
Power density miscalculation
Racks specced modestly at pricing end up hosting GPU workloads pulling several times the load by fit-out. We raise the density question at pricing, so the cooling matches where the IT load is going, not today's rack sheet.
Capability
Mechanical scope delivered inside the data hall.
We are configured to deliver mechanical packages from $50,000 to $1 million on this work. That band is wider than the rest of the site on purpose, because data hall packages carry more plant per square metre than anything else we build.
CRAC / CRAH installation
Placement, pipework, condensate and controls integration.
Hot and cold aisle containment
Sized to the rack layout, sealed for return-air isolation and PUE performance.
N+1 redundancy
Concurrently maintainable configurations built to the consultant's design, with failover paths proven rather than assumed.
Precision cooling commissioning
Documented to the room's load profile. Air balancing, temperature mapping, sign-off pack.
Server and comms rooms
The same technical principles as the data hall, in a smaller envelope.
High-density heat loads
Cooling for concentrated racks, where a couple of degrees at the rack inlet is the whole problem.
In-row cooling
Close-coupled cooling for higher density racks, integrated with containment.
Integrated commissioning
Aligned with electrical and controls, witnessed with the other trades. One package, one accountable lead.
CBD office conversion
CBD floors are becoming data halls.
Vacant CBD floors are being assessed as Edge data halls and overflow colocation capacity, often in towers whose chilled-water plant is already rated for high-occupancy loads. Plant already in the building cuts capital cost and program risk against a greenfield build, and the fit-out work sits in the white space.
Plant already in place
Building chilled water typically exists. The work is white-space side.
CRAH integration
Coupling air handlers into existing chilled-water risers. Our lane.
Floor-by-floor delivery
Constrained access, live-building protocols, builder-side mechanical.
Sized for the package
Conversions don't suit hyperscale crews. They suit a team sized for fit-outs.
The right fit
Where we fit, and where we don't.
This is for you
D&C builders, consultants and operators with single-hall white space, server rooms or CBD conversions, built to the consultant's design. After handover we service the same gear.
This is not for you
Hyperscale base building. That is tier-one work and we won't pretend otherwise.
